Skip to content
Mock demo · simulated data

Mock demo · synthetic data

One workflow layer over every service line

Requests move through intake, assignment, inspection and sign-off. HVAC, plumbing, electrical, grounds and cleaning keep their own checks, but share the same path, the same status board and the same approval step.

The shared path

Every request follows the same four steps, whichever line it belongs to.

  1. Step 1

    Intake

    Triage the request

  2. Step 2

    Assigned

    A technician owns it

  3. Step 3

    Inspection

    Work checked on site

  4. Step 4

    Sign-off

    Approval before closing

Five lines, line-specific inspection

The path is shared; the inspection step is not. Each line brings its own check.

  • HVAC

    Inspection: Airflow and pressure check

  • Plumbing

    Inspection: Leak and flow test

  • Electrical

    Inspection: Load and isolation test

  • Grounds

    Inspection: Site walk and photo record

  • Cleaning

    Inspection: Checklist and spot audit

  • Approval rule

    Any request estimated at $1,500 or more waits for an approver before it can close.

Try it with invented data

Assign a team, advance a request, approve at sign-off. Nothing leaves your browser.

Go to the board